235 m length floating dock modernization
Works on the repair and modernization of the floating dock including metal replacement, fabrication, and assembly of new sections in the period from 2017 to 2020.
This floating dock is the largest in the Baltic States, with a length of 235 m, a width of 45 m, and the ability to receive Panamax, Post-Panamax, and Aframax vessels. Therefore, Skaila UAB and partners’ significant workforce were involved in the process.
Dozens of welders, assemblers, foremen have done a long and thorough job.
As a result, the renovated and modernized dock received its first ship in July 2020.






